Base + topcoat
Resin bound base + topcoat installation
The resin-bound base course and topcoat, laid by one installation team.
Scope
Surface Install Co. installs the base layer and the resin-bound topcoat. The formation, sub-base, drainage, falls, levels and edge restraints beneath the resin-bound base are by others.
Installation sequence
- Site handover against readiness checklist
- Base layer installation
- Curing period as required
- Topcoat installation
- Site handover on completion
Indicative trade rates
Rates are indicative and subject to project specification, access, location and technical review.
| Area | Rate |
|---|---|
| Under 75m² | £1,750 minimum charge |
| 75–150m² | From £28/m² |
| 150–300m² | From £25/m² |
| 300m²+ | From £22/m² |
Got a project to price?
Build your installation estimate in minutes from site or office.
